We have been operating a CIL since 2013 and we are currently in the process of reviewing the charging schedule.
We published the CIL Draft Charging Schedule and supporting evidence documents for statutory consultation from 30 April to 11 June 2025.
On 28 November 2025, the CIL Draft Charging Schedule and associated evidence documents were submitted for independent examination. This was under Regulation 19 of the Community Infrastructure Levy Regulations 2010 (as amended).
Read the Statement of Fact for further details.
Submission documents
Download the CIL Draft Charging Schedule review documents submitted for independent examination:
- LBC-01 Croydon CIL Draft Charging Schedule - April 2025 (PDF, 2.3MB)
- LBC-02 Croydon CIL Viability Study - March 2024 (PDF, 5.4MB)
- LBC-03 Infrastructure Delivery Plan 2025 (PDF, 1.8MB)
- LBC-04 Infrastructure Funding Gap Statement 2025 - April 2025 (209KB)
- LBC-05 Statement of Representation Procedure - April 2025 (PDF, 155KB)
- LBC-06 CIL CSR copies of representations (November 2025) [REDACTED] (PDF, 3.3MB)
- LBC-07 Statement of Consultation - November 2025 (PDF, 676KB)
- LBC-08 Statement of Compliance - November 2025 (PDF, 281KB)
- SD-01 Croydon Statement of Community Involvement (PDF, 364KB)
Printed copies of the submission documents are available for inspection at our library branches.
Statutory Consultation
Refer to our engagement platform for more information on the CIL Charging Schedule Review and the statutory consultation process.