Brighton Road is a major corridor linking Croydon town centre with the south of the borough. From 3 April, we will introduce improvements to benefit cyclists and pedestrians on an experimental basis for up to 18 months.
Some of the improvements include segregated cycle lanes to separate motor vehicles, as well as improved pedestrian crossings. These works are part of a wider scheme that will also include public realm improvements, of which more information will be available later this year.
Brighton Road was originally identified by Transport for London (TfL) as a major corridor with potential to encourage more journeys to be made by bike, by making the existing cycle lanes safer. In 2021, the council first approved plans to introduce a trial scheme in the area. Following the local elections in 2022, the scheme underwent changes to improve access for local businesses. Works began on the new, current scheme in March 2023.
These measures have been introduced under an Experimental Traffic Management Order (ETMO) that is effective from 3 April 2023, and will remain in place for up to 18 months. This means the scheme can be monitored and assessed throughout the experiment – and if necessary – changes can be made before the council decides whether or not to continue with the scheme on a permanent basis.
The official objection period (consultation) begins 6 months from the operational date of 3 April 2023 to 3 October 2023 at midnight. Any objections received after this period cannot not be considered.
Download a map showing the Brighton Road layout (PDF, 2.5MB)
The trial process of an ETMO is designed to allow residents, businesses, schools, and other stakeholders time to experience the scheme, and then come forward with any issues or suggested amendments that could make the scheme work better and achieve its goals.
You can send your views via the online “Get Involved “and you can also send in any objections you may have using the same web site. You will only be able to submit objections from 3 April 2023 when the Experimental Order comes into force and during the first 6 months of the trial period from the 3rd of April. Objections received before or after these dates will not be accepted. You can send in your views and/ or objections via the following:
NEW Help improve this site by giving feedback Show Hide
Send feedback directly to the content team using our website feedback form
You can also join our user research group to receive invites to activities and surveys to help shape future improvements to the site.